All Services

Rooftop Solar (PV)

Self-consumption solar systems for residential, commercial and industrial roofs, built on half-cut monocrystalline panels.

Rooftop Solar (PV)

Our rooftop systems use half-cut monocrystalline panel technology. Splitting the cells into smaller sections with separated bypass diodes lets the upper and lower halves of the panel work independently: internal resistance drops, output rises, and shading losses shrink.

In a standard panel, one shaded cell stops the entire string — roughly a third of the panel. In a half-cut panel, the unshaded half keeps producing. On roofs, where chimney, antenna and parapet shadows are unavoidable, that difference turns directly into yield.

The panels we install carry a 25-year performance warranty, retaining 90% of their output at year 12.

Everything from survey to commissioning — structural assessment, permitting, installation, grid connection and net-metering applications — runs under a single contract.

Get a Quote