All Services

Hybrid & Storage

Lithium-ion battery storage and hybrid plant design: plan generation around demand, not around the sun.

Hybrid & Storage

Storage turns solar from “generation while the sun shines” into “supply when it is needed”. In our hybrid designs, photovoltaic generation pairs with battery storage; SCADA-based load balancing dispatches output according to what the grid needs.

We build storage on lithium-ion technology: high energy density, no memory effect and slow self-discharge make it the standard for solar applications. Cells run at 3.6V nominal and 4.2V peak; capacity loss after around 500 cycles stays near 10%. It is also a safer chemistry than lithium-polymer.

Cell chemistry is chosen per application — LiPo, LiFePO4 or lithium titanate — and the battery’s C-rating (charge/discharge rate) is sized to the usage scenario.

Get a Quote