Hydro ~350 MW

Hydroelectric Power Plant

Hydroelectric Power Plant

A run-of-river design reaching roughly 350 MW of installed capacity through four Francis turbines.

The water conveyance works comprise a 4.2-kilometre headrace tunnel and a 120-metre penstock — a scale that demands tunnelling, hydromechanical equipment and electromechanical erection coordinated on a single programme.