Products

Solar Tree

A solar tree that marries renewable generation with decorative landscaping — storage in the trunk keeps it supplying power at night and in emergencies.

Solar Tree

Solar trees bring renewable generation into decorative landscaping. High-efficiency panels mounted on the branches generate DC power; inverters hidden in the trunk convert it to usable AC. A storage unit inside the trunk discharges down to about 10%, keeping power flowing at night and under overcast skies.

Application Purposes

  1. Electricity generation and energy saving — offsets the consumption of the area it serves.
  2. Renewable clean energy — a direct contribution to environmental sustainability.
  3. Grid-independent supply — a resilient power source for earthquakes and emergencies, equippable with assembly-area lighting, PA announcements, information screens and Wi-Fi hotspots.
  4. Landscape aesthetics and public awareness — makes clean energy visible in public space.

Options

Emergency lighting · emergency PA system · information screens · Wi-Fi access points · integrated bench · higher-capacity battery · audible and visual alarm · alternative designs per use case.

Why a Solar Tree?

  • More than 200 colour options and accessories that carry your corporate identity
  • Optional sun-tracking system
  • Modular, fast assembly
  • 80% recycled material
  • Rated for 80 km/h winds
  • Cuts infrastructure cost in energy-free park designs
  • Its annual output avoids roughly 250 kg of CO₂ — about what 10 mature trees absorb in a year

Upcoming Designs

On our roadmap — in development, not yet part of the product range:

  • Solar pergola with integrated benches
  • Solar street lighting
  • Solar carport (500 × 290 × 240 cm)

Gallery

Solar tree product renderSolar trees on a city squareSolar tree with night lightingSolar tree with seating in a parkSolar tree technical drawings
Get a Quote