Natural Gas ~550 MW
Natural Gas Combined-Cycle Plant
A natural gas combined-cycle plant of roughly 550 MW built on GE LM6000 gas turbines.
Grid connection is provided by a 220 kV gas-insulated (GIS) substation; the project was delivered on a 36-month EPC schedule.
Experience accessed through the partnership with SILEX EPC.