Solar 175 MW
Solar Power Plant
Spread across 320 hectares, the plant uses sun-tracking (tracker) structures that raise annual yield well above fixed-tilt systems.
The scope covered end-to-end engineering, procurement and installation — including substation integration and grid synchronisation — delivered on a 24-month schedule.
Experience accessed through the partnership with SILEX EPC.