Wind ~500 MW
Wind Farm
An onshore wind programme developed in three phases, reaching roughly 500 MW across 125 turbines.
Grid connection is made through air-insulated substations — 145 kV on the Pakistan side and 170 kV in Türkiye.
Experience accessed through the partnership with SILEX EPC.