Process
Process
Every project passes through the same six steps. Order and responsibilities are fixed from the start; there are no surprises.
- 01
Survey & Site Analysis
Your site is inspected in person: roof or land condition, shading, structural capacity and grid-connection options are reported.
- 02
Feasibility & Energy Balance
Your consumption profile is measured; generation simulation, energy balance and payback analysis put numbers under the investment decision.
- 03
Design & Permitting
Structural and electrical designs are prepared; applications, permits and the connection agreement are handled end to end.
- 04
Procurement
Panels, inverters, mounting structures and switchgear are procured with warranty terms and delivery schedules pinned down.
- 05
Installation & Commissioning
Installation is completed to HSE standards; testing is performed, the system is synchronised with the grid and handed over with a delivery report.
- 06
Monitoring & O&M
Generation is monitored remotely; scheduled maintenance, cleaning and performance optimisation protect the committed output.